Shower Installation & Tub-to-Shower Conversion in Austin, TX

A shower is the part of a bathroom most likely to fail badly if it is built wrong, because everything that goes wrong happens behind the tile where you cannot see it. Waterproofing is the stage that decides whether the room still looks right in ten years, and it is the stage that gets rushed on a cheap quote.

Google · 90 reviews

Yelp

Thumbtack

Get Your Free Consultation

What Happens Behind the Tile Decides Everything

Substrate, then membrane, then tile — in that order, with the falls set correctly so water reaches the drain rather than sitting. That sequence is not optional and it cannot be inspected once tiling starts. It is the single clearest difference between a shower that lasts and one that quietly damages the floor beneath it.

Bathroom Services We Handle In-House

Bathtub Replacements

Swapping a tub like-for-like, or removing one entirely — we tell you which the plumbing actually allows.

Shower Installations

Walk-in showers, frameless glass and low-threshold trays, waterproofed properly before any tile goes on.

Tub-to-Shower Conversions

Converting an unused tub into a shower, including what changes when the drain has to move.

Countertop Installation

Quartz, granite and solid surface vanity tops, templated to the units actually installed.

Sink & Faucet Installation

Basins, vanities and taps fitted with the supply and waste work done to standard, not bodged.

Tile & Waterproofing

The stage nobody sees and everything depends on — substrate, membrane, then tile.

Ventilation & Extraction

Extraction sized for the room so moisture leaves instead of settling in the plaster and grout.

Storage & Cabinetry

Vanity storage and built-ins planned around a small footprint rather than squeezed in afterwards.

Accessible Bathrooms

Curbless entries, wider doorways and grab-rail blocking built in while the walls are open.

Why Tub-to-Shower Conversions Vary So Much in Price

It comes down to whether the drain moves. Keeping the existing drain position makes a conversion relatively contained. Relocating it means opening the floor, which brings structure and permitting into scope. We establish which applies to your bathroom before quoting, so the number does not change halfway through.

Related Bathroom Services:

How a Bathroom Project Runs, Step by Step

Every project runs the same way, so you always know what happens next.

1

Personalized Consultation & Design

We collaborate with you to craft a design that matches your style and needs, ensuring every detail reflects your vision.

2

Material Selection & Customization

Choose from premium materials with guidance from our experts, balancing beauty, durability, and budget.

3

Flawless Execution

Our skilled professionals handle every step of the process with precision, ensuring high-quality results that exceed expectations.

4

Final Review & Client Approval

We walk you through the finished project to confirm every element meets your satisfaction, guaranteeing you'll love the results.

Walk-in shower with frameless glass and brushed gold fixtures in an Austin bathroom remodel

Walk-Ins, Frameless Glass and Low Thresholds

Walk-in showers with frameless glass are the most requested bathroom change we handle. Low or curbless thresholds are worth considering if you plan to stay in the home long term — they cost little extra while the floor is already open and are expensive to add later. Niche placement, bench height and glass panel size all get decided before tiling, not during.

Floating wood vanity with vessel basin and backlit round mirror in an Austin bathroom remodel

Screens, Trays and Controls

Frameless glass needs the opening to be true, which is another reason substrate work matters. Thermostatic controls are worth the difference in a house where someone else running a tap changes the temperature. Rainfall heads need adequate flow to work as intended — worth checking before specifying one.

Recent Bathroom Projects

Get Your Free Consultation

Schedule Your Free Estimate Today!

Whatever the size of the project, you get a fixed-price quote within seven days and a clear programme before any work starts.